可选产品分析
经您允许,我们会使用注重隐私的有限分析来了解哪些研究流程有效。我们不会使用广告跟踪器或会话录制。您可以在偏好设置中更改此选择。请阅读 隐私政策.
Iron Mountain Incorporated's published Sell conclusion compares the analysis-date price with fair value and potential value. Read the full report for assumptions, evidence, and material risks.
| Market cap | $33.8B | |
|---|---|---|
| Revenue (ttm) | 7.6B | |
| Net income (ttm) | 418.7M | |
| EPS (ttm) | $1.40 | |
| Shares out | 297.7M | |
| P/E (trailing) | 82.6x | |
| P/E (forward) | 58.5x | |
| Dividend | $3.46 (2.99%) | |
| Volume | 897,265 | |
| Beta | 1.19 |
Recent price action with selectable time range.
| Item | P1 | P2 | P3 | P4 | P5 | Trend |
|---|---|---|---|---|---|---|
| Period | 2021-12-31 | 2022-12-31 | 2023-12-31 | 2024-12-31 | 2025-12-31 | Trend |
| Revenue | $4.49B | $5.10B | $5.48B | $6.15B | $6.90B | +11.3% |
| Gross profit | $2.60B | $2.91B | $3.12B | $3.45B | $1.77B | -9.2% |
| Operating income | $854.2M | $1.05B | $921.8M | $1.01B | $1.16B | +8.0% |
| Net income | $450.2M | $557.0M | $184.2M | $180.2M | $144.6M | -24.7% |
| EPS (diluted) | $1.55 | $1.90 | $0.63 | $0.61 | $0.49 | -25.0% |
| EBITDA | $1.75B | $1.87B | $1.62B | $1.91B | $2.08B | +4.4% |
| R&D | $0 | $0 | $0 | — | — | -46.5% |
| SG&A | $1.02B | $1.14B | $1.24B | $1.34B | $1.39B | +8.1% |
Recent company headlines from major financial publishers.
The base scenario projects a target of $47.63 with an estimated probability of 55.0% and an implied return of -58.0% relative to $113.39 (as of 2026-10-02). This outcome requires core physical records storage to sustain inflation-linked contract price increases, while the data center pipeline energizes in line with commercial schedules and asset lifecycle management expands toward full-year targets. Capex intensity is assumed to moderate gradually beyond the initial buildout phase, allowing operating cash generation to narrow the free cash flow deficit. This path would be disconfirmed by prolonged grid interconnection delays or decelerating organic growth in records management, which would become visible through quarterly segment disclosures over the coming fiscal periods.
The bull scenario projects a target of $58.82 with an estimated probability of 20.0% and an implied return of -48.1% relative to $113.39 (as of $113.39 (as of 2026-10-02)), aligning with Potential value of $58.82. This path requires rapid energization of data center capacity supported by strong hyperscale lease absorption, accelerating enterprise adoption of asset lifecycle management, and core records storage maintaining pricing power. Under this trajectory, capital expenditure normalizes rapidly toward maintenance levels post-buildout, driving free cash flow sharply positive. This scenario would be disconfirmed if hyperscale leasing pauses or if construction supply chain bottlenecks prevent timely delivery of energized megawatts.
| Ke ↓ / g → | 2.3% | 2.5% | 2.8% | 3.0% | 3.3% |
|---|---|---|---|---|---|
| 8.4% | $50.2 | $50.8 | $51.4 | $52.2 | $52.9 |
| 8.9% | $48.4 | $48.9 | $49.4 | $50.0 | $50.6 |
| 9.4% | $46.7 | $47.2 | $47.6 | $48.1 | $48.7 |
| 9.9% | $45.3 | $45.7 | $46.1 | $46.5 | $46.9 |
| 10.4% | $44.0 | $44.3 | $44.7 | $45.0 | $45.4 |
Upcoming earnings date and setup when available.
每月发布的研究版本所给出的评级。评级比较分析日的价格与公允价值,并不记录判断是否正确。
| 年份 | 1月 | 2月 | 3月 | 4月 | 5月 | 6月 | 7月 | 8月 | 9月 | 10月 | 11月 | 12月 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2026 |